University of Edinburgh-Argyle House
Project Value £1.1m
The work involved the refurbishment of the west wings on 4 floors and east wings of a further 4 floors to be undertaken in 3 phases. Floors were occupied by third parties, therefore shut down of supplies and alterations to other services affecting their business had to be programmed outwith normal working hours. The work encompassed design, delivery and installation. All electrical systems/installations were stripped out and replaced in their entirety, including cabling installations back to source.
Disciplines: Electrical-Fire-Intruder-Data/Fibre Network, Lighting Management and CCTV
Airspace-Playsport East Kilbride
Project Value £ 203,000
A first for Glasgow, Airspace is a freestyle jumping revolution, created within Play-Sport East Kilbride complex. Using Thorn LED high bay and flex 7 lighting Management systems, steel containment and conduit conlok systems were used to give the industrial vision for this amazing new 100 trampoline concept.
Disciplines: Electrical-Fire-Intruder-Data/Fibre Network-Lighting Management- Lightning Protection
Crosbie Tower, Troon
Project Value £114,000
Refurbishment of a late 19th century listed building in Troon’s South Beach into 9 flats including 5 large apartments and 4 duplex apartments
Disciplines: Electrical-Fire-Intruder-Security Access Control
Pure Spa, Buchanan Quarter, Glasgow
Project Value £ 58,000
Refurbishment of the Ground, 1st floor of this base build shell conversion of a
Victorian facade retention and new build at Buchanan Quarter Glasgow.
Disciplines: Electrical-Fire-Intruder-Access Control
Clydespace Skypark 5 Suite 5B
Project Value £ 54,000
In the last 10 years, we have won and delivered approximately £2.5 million worth of refurbishment projects within the Skypark Complex. This new project was Clydespace’s relocation from West Of Scotland Science Park and we created a bespoke office space for their expansion proposals in the space industry.
Disciplines: Electrical-Fire-Intruder
OKI Little Drum Rd. Cumbernauld
Project Value £ 430,000
Refurbishment of 60,000 sq. ft. of Warehouse and office space for OKI’s relocation from their exiting premises to this new purpose built facility. Project involved complete refurbishment of existing electrical section-board and Power factor correction unit, complete new distribution and containment system for filling lines and offices. The warehouse and production area was lit by a Zumtobel high bay T5 modules and Associated daylight sensing lighting system.
Disciplines: Electrical-Fire-Intruder-CCTV-Data/Fibre Network- Lighting Management-Lightning Protection
Atrium Court, Glasgow
Project Value £ 241,000
Refurbishment of 2nd floor offices, rip out and fit-out.
Disciplines: Electrical-Fire
Spectrum Building, Glasgow
Project Value £ 78,000
Refurbishment of 5th floor office, rip out and fit-out.
Disciplines: Electrical-Fire
50 Melville Street, Edinburgh
Project Value £ 62,000
Refurbishment of 3 floors of offices, rip out and fit-out. Disciplines: Electrical-Fire-Intruder-Access Control
177 West George Street, Glasgow
Project Value £ 81,000
Refurbishment of Ground Floor and First floor offices, rip out and fit-out.
Disciplines: Electrical-Fire
Ongoing work for Royal London Group in Edinburgh
£ 500,000-£750,000
3 Phase rip out and complete refurbishment of a 6 floor and a 5 floor building whilst occupied over an 18 month period.
Disciplines: Electrical-Fire-Data