University of Edinburgh-Argyle House

Project Value £1.1m

edinburgh

The work involved the refurbishment of the west wings on 4 floors and east wings of a further 4 floors to be undertaken in 3 phases. Floors were occupied by third parties, therefore shut down of supplies and alterations to other services affecting their business had to be programmed outwith normal working hours. The work encompassed design, delivery and installation. All electrical systems/installations were stripped out and replaced in their entirety, including cabling installations back to source.

Disciplines: Electrical-Fire-Intruder-Data/Fibre Network, Lighting Management and CCTV

Airspace-Playsport East Kilbride

Project Value £ 203,000

airspace2

A first for Glasgow, Airspace is a freestyle jumping revolution, created within Play-Sport East Kilbride complex. Using Thorn LED high bay and flex 7 lighting Management systems, steel containment and conduit conlok systems were used to give the industrial vision for this amazing new 100 trampoline concept.

Disciplines: Electrical-Fire-Intruder-Data/Fibre Network-Lighting Management- Lightning Protection

Crosbie Tower, Troon

Project Value £114,000

crosby tower2

Refurbishment of a late 19th century listed building in Troon’s South Beach into 9 flats including 5 large apartments and 4 duplex apartments

Disciplines: Electrical-Fire-Intruder-Security Access Control

Pure Spa, Buchanan Quarter, Glasgow

Project Value £ 58,000

pure spa2

Refurbishment of the Ground, 1st floor of this base build shell conversion of a

Victorian facade retention and new build at Buchanan Quarter Glasgow.

Disciplines: Electrical-Fire-Intruder-Access Control

Clydespace Skypark 5 Suite 5B

Project Value £ 54,000

skyparknew2

In the last 10 years, we have won and delivered approximately £2.5 million worth of refurbishment projects within the Skypark Complex. This new project was Clydespace’s relocation from West Of Scotland Science Park and we created a bespoke office space for their expansion proposals in the space industry.

Disciplines: Electrical-Fire-Intruder

OKI Little Drum Rd. Cumbernauld

Project Value £ 430,000

oki 2

Refurbishment of 60,000 sq. ft. of Warehouse and office space for OKI’s relocation from their exiting premises to this new purpose built facility. Project involved complete refurbishment of existing electrical section-board and Power factor correction unit, complete new distribution and containment system for filling lines and offices. The warehouse and production area was lit by a Zumtobel high bay T5 modules and Associated daylight sensing lighting system.

Disciplines: Electrical-Fire-Intruder-CCTV-Data/Fibre Network- Lighting Management-Lightning Protection

Atrium Court, Glasgow

Project Value £ 241,000

atruim2

Refurbishment of 2nd floor offices, rip out and fit-out.

Disciplines: Electrical-Fire

Spectrum Building, Glasgow

Project Value £ 78,000

Spectrum2

Refurbishment of 5th floor office, rip out and fit-out.

Disciplines: Electrical-Fire

50 Melville Street, Edinburgh

Project Value £ 62,000

Melville2

Refurbishment of 3 floors of offices, rip out and fit-out. Disciplines: Electrical-Fire-Intruder-Access Control

177 West George Street, Glasgow

Project Value £ 81,000

West George Street2

Refurbishment of Ground Floor and First floor offices, rip out and fit-out.

Disciplines: Electrical-Fire

Ongoing work for Royal London Group in Edinburgh

£ 500,000-£750,000

Royal London Grou

3 Phase rip out and complete refurbishment of a 6 floor and a 5 floor building whilst occupied over an 18 month period.

Disciplines: Electrical-Fire-Data